Administrative Code (AC)
Title 28: Construction Codes
Sections in Administrative Code title 28.
- Sections
- 1,295Sections
- Page
- 3 / 13Page
Search NY Legal Codes
Try “24 RCNY 8-09”, “penal law 155.25”, or “cooling tower”.
Sections
- AC § 28-105.4
§ 28-105.4 Work exempt from permit.
- AC § 28-105.4.1
Emergency work.
- AC § 28-105.4.2
Minor alterations and ordinary repairs.
- AC § 28-105.4.2.1
Definitions.
- AC § 28-105.4.3
Public utility company or public utility corporation.
- AC § 28-105.4.4
Ordinary plumbing work.
- AC § 28-105.4.5
Sign permits.
- AC § 28-105.4.6
Geotechnical investigations.
- AC § 28-105.4.7
§ 28-105.4.7
- AC § 28-105.5
Application for permit.
- AC § 28-105.5.1
Applicant for permit.
- AC § 28-105.5.2
Application for permit where a building is occupied.
- AC § 28-105.5.3
Owner statement.
- AC § 28-105.5.3.1
Audit.
- AC § 28-105.6
Fees.
- AC § 28-105.7
Time limitation of applications.
- AC § 28-105.8
Validity of permit.
- AC § 28-105.8.1
Duration of permit.
- AC § 28-105.8.2
Signature of commissioner on permit.
- AC § 28-105.9
Expiration.
- AC § 28-105.9.1
Reinstatement.
- AC § 28-106.1
Asbestos certification required.
- AC § 28-106.1.1
Full demolition permit.
- AC § 28-106.1.2
Alteration permit for the removal of one or more stories.
- AC § 28-106.2
Construction and maintenance of asbestos containment structures and other temporary structures or work required for asbestos abatement activities.
- AC § 28-106.2.1
Materials.
- AC § 28-106.3
Permit exemption.
- AC § 28-106.4
Definitions.
- AC § 28-107.1
General.
- AC § 28-107.2
Definitions.
- AC § 28-107.3
Covered categories of work.
- AC § 28-107.4
Required submittal documents.
- AC § 28-107.5
Filing process.
- AC § 28-107.6
Time period for acceptance or rejection.
- AC § 28-107.7
Denial of certification.
- AC § 28-107.8
Request for stop-work or rescission.
- AC § 28-107.9
Effect of denial or rescission.
- AC § 28-108.1
General.
- AC § 28-108.2
Pavement plan required.
- AC § 28-108.3
Improvement of streets.
- AC § 28-109.1
Fire protection plan required for covered buildings.
- AC § 28-109.2
Covered buildings.
- AC § 28-109.3
Scope.
- AC § 28-110.12 citations
Site safety plan.
- AC § 28-110.2
Phased site safety plans.
- AC § 28-1101.1
Enactment of the New York city electrical code.
- AC § 28-1101.2
Update.
- AC § 28-1101.3
The New York city amendments to the 2020 National Electrical Code.
- AC § 28-111.1
General.
- AC § 28-111.1.1
Permits for the erection and use of temporary structures.
- AC § 28-111.1.2
Letters authorizing temporary uses.
- AC § 28-111.2
Conformance.
- AC § 28-111.3
Termination of approval.
- AC § 28-111.4
Application processing.
- AC § 28-111.5
Fees.
- AC § 28-111.6
Place of assembly.
- AC § 28-112.1
Payment of fees.
- AC § 28-112.10
Waiver of application, permit and inspection fees for certain work arising out of the storm that occurred on October 29 and 30, 2012.
- AC § 28-112.10.1
Eligible buildings.
- AC § 28-112.10.2
Storm related damage to electrical and plumbing systems.
- AC § 28-112.11
Waiver of application, permit and inspection fees for work funded under the "Build It Back" program.
- AC § 28-112.12
Reduction in fees or penalties for sponsoring site safety training.
- AC § 28-112.13
Permit filing fees for one-, two- or three-family dwellings damaged by a fire.
- AC § 28-112.2
Schedule of permit fees.
- AC § 28-112.2.1
§ 28-112.2.1
- AC § 28-112.2.2
§ 28-112.2.2
- AC § 28-112.3
Building permit valuations.
- AC § 28-112.4
Work commencing before permit issuance.
- AC § 28-112.5
Related fees.
- AC § 28-112.6
Refunds and rebates.
- AC § 28-112.6.1
Withdrawal of work permit applications.
- AC § 28-112.6.2
Withdrawal of cranes and derricks applications.
- AC § 28-112.6.3
Incentive rebates.
- AC § 28-112.6.3.1
Renewable energy rebates.
- AC § 28-112.6.3.2
Rebate for energy use reduction.
- AC § 28-112.6.3.3
Rebate for water conservation systems.
- AC § 28-112.6.3.4
Rebate for redevelopment, remediation and reuse of contaminated properties known as brownfields.
- AC § 28-112.6.3.5
Rebate for recycling construction and demolition waste.
- AC § 28-112.6.3.6
Rebate for bicycle storage facilities.
- AC § 28-112.6.3.7
Rebate for LEED or other environmental design certification.
- AC § 28-112.6.3.8
Other rebates.
- AC § 28-112.7
Inspection and report filing fees.
- AC § 28-112.7.1
Fees for the testing, approval, inspection and use of power-operated cranes, derricks and cableways.
- AC § 28-112.7.2
Report filing fees.
- AC § 28-112.7.3
Other inspection fees.
- AC § 28-112.7.4
Equipment inspection fees.
- AC § 28-112.8
Special fees.
- AC § 28-112.9
Lien on premises for unpaid fee or other charge.
- AC § 28-112.9.1
Filing of fees.
- AC § 28-112.9.2
Lien.
- AC § 28-112.9.3
Notice.
- AC § 28-112.9.4
Interest.
- AC § 28-112.9.5
Tax lien.
- AC § 28-112.9.6
Reference.
- AC § 28-112.9.7
Validity not subject to challenge in enforcement proceeding.
- AC § 28-112.9.8
Standing to challenge.
- AC § 28-113.1
General.
- AC § 28-113.2
Use of materials.
- AC § 28-113.2.1
Approved material.
- AC § 28-113.2.2
Alternative materials.
Facing a violation tied to one of these codes?
Nacmias Law Firm represents owners and operators in OATH/ECB matters across all five boroughs, working directly with the codes indexed here.