§ 28-112.7.1 Fees for the testing, approval, inspection and use of power-operated cranes, derricks and cableways.
AC § 28-112.7.1
The owner of any crane or derrick shall renew the certificate of operation each year. See Table 28-112.7.1. Table 28-112.7.1 Equipment TypeFiling FeeRenewal FeeCommentsEquipment TypeFiling FeeRenewal FeeCommentsPrototype approval of one configuration of a mobile crane. One configuration shall be comprised of the crane with a main boom, one fixed jib and one set of counterweights.$2,500 when testing has been monitored and certified by a competent individual or group, other than the manufacturer, acceptable to the commissioner;$4000 when, in lieu of monitoring and certification of tests, the commissioner shall require design calculations for such items as the commissioner deems necessary to supplement the tests.Additional configurations shall be subject to the same fee as the original configuration.Amendment to a configuration.One-half the original configuration fee.Prototype approval of a mobile crane with a hydraulic boom.$4,000 Certificate of approval for mobile crane with a boom less than 200 feet in length; fee also includes initial certificate of operation.$500$250 annuallyThe boom length as herein specified shall include the jibs and any other extensions to the boom.Certificate of approval for mobile crane with a boom 200 feet or more in length, but less than 300 feet in length; fee also includes initial certificate of operation.$1,000$250 annuallyThe boom length as herein specified shall include the jibs and any other extensions to the boom.Certificate of approval for mobile crane with a boom 300 feet or more in length but less than 400 feet in length; fee also includes initial certificate of operation.$2,000$400 annuallyThe boom length as herein specified shall include the jibs and any other extensions to the boom.Certificate of approval for mobile crane with a boom 400 feet or more in length; fee also includes initial certificate of operation.$3,000$400 annuallyThe boom length as herein specified shall include the jibs and any other extensions to the boom.Certificate of approval for master climber and tower cranes and derricks, regardless of length; fee also includes initial certificate of operation.$3,000$400 annually Certificate of approval for all other cranes; fee also includes initial certificate of operation.$1,000$250 annually Certificate of approval required for a mobile crane with a boom not exceeding 50 feet in length with a maximum rated capacity not exceeding 3 tons; fee also includes initial certificate of operation.$300$200 annuallyThe boom length as herein specified shall include the jibs and any other extensions to the boom.Certificate of operation-sign hanger, 51 feet to 135 feet with capacity of 3 tons or less.$250$200 annually New certificate of approval, when the boom or extension thereof is replaced or altered.The fee shall be the full fee required for testing a new crane or derrick. with a boom or extension of the same size and design as the replacement boom or extension thereof. Review only of engineering calculations for mobile crane with a boom exceeding 250 feet to be erected by a licensed master or special rigger, for which a certificate of on-site inspection is not required under this code or rules of the department.$130 On-site inspection of up to three models of mobile cranes with boom, including jibs and other extensions to the boom 250 feet or more in length, or derrick.$250 during business hours;$750 outside business hours; upon written request of the applicant.$130 All other on-site inspections of cranes.$150$130 Amendment to an application for certificate of on-site inspection.$130 Application for waiver of on-site inspection of mobile crane or derrick.$130 Notification of Outrigger Beam Installation or dismantlingAs provided by department rules Notification of use, installation or dismantle of all cranesAs provided by department rules (Am. L.L. 2021/126, 11/7/2021, eff. 11/7/2022) Editor's note: For related unconsolidated provisions, see Appendix A at L.L. 2021/126.













