What is NYC RCNY § 2-08?

Quick Answer

(a) Performance requirements. (1) All installations, including pre-existing equipment, must be required to operate such that upon evaluation of performance tests (as outlined in subdivision (e) below) it is determined that they meet the following minimum requirements: (2) When the boiler is fired at 80 to 110 percent

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

§ 2-08 Performance Testing.

RCNY § 2-08

(a)Performance requirements.

(1)All installations, including pre-existing equipment, must be required to operate such that upon evaluation of performance tests (as outlined in subdivision (e) below) it is determined that they meet the following minimum requirements: (2) When the boiler is fired at 80 to 110 percent of the burner's maximum operational oil/gas delivery rate as specified in the application, provided that this is less than the burner's maximum design oil/gas delivery rate, oil burning installations must have a combustion efficiency of at least 83 percent and gas burning installations must have a combustion efficiency of at least 80 percent. Dual-fuel installations must meet the requirements for each respective fuel. Oil fired installations which cannot achieve a combustion efficiency of at least 83 percent but which can achieve a combustion efficiency of at least 80 percent will have no more than one renewal cycle (three years) in which to perform necessary alterations to bring the equipment into compliance. Gas fired installations which cannot achieve a combustion efficiency of at least 80 percent will have one renewal cycle (three years) in which to perform necessary alterations to bring the equipment into compliance.

(3)When the boiler is fired at 80 to 110 percent of the burner's maximum operational oil/gas delivery rate as specified in the application, provided that this is less than the burner's maximum design oil/gas delivery rate, the maximum acceptable smoke reading must be smoke spot no. 3 in accordance with ASTM International Standard D 2156-09.

(4)When the boiler is fired at 80 to 110 percent of the burner's maximum operational oil/gas delivery rate as specified in the application, provided that this is less than the burner's maximum design oil/gas delivery rate), the installation must be capable of providing adequate pressure differential (e.g., draft) at conditions specified in subdivision (e) of this section.

(5)For installations which have low-high-low-off or modulating combustion controls, adherence to the requirements in paragraphs (a)(1) and (2), listed above, must also be demonstrated when the burner is fired at low-fire. For installations which utilize modulating combustion controls, the department requires and reserves the right to verify that the performance requirements in paragraphs (a)(1) and (2), listed above, are also met at intermediate firing rates.

(6)For multiple boiler installations the requirements in paragraphs (a)(1), (2), (3) and (4), listed above, must be demonstrated for each boiler when said boilers are operated simultaneously rather than individually when there is sufficient load demand from the premise. However, each boiler in a multiple boiler installation, when fired separately (i.e., all other boilers are shut down), must also meet these requirements and the department reserves the right to verify same.

(7)In no case must the flame impinge on any interior surface within the furnace.

(b)Preparation for performance tests. In order to facilitate implementation of the performance test by the department's engineer, provision must be made by the installer, sufficiently in advance of the scheduled inspection, such that: (1) Continuous, uninterrupted operation of the boiler at 80 to 110 percent of the burner's maximum operational oil/gas delivery rate as specified in the application, provided that this is less than the burner's maximum design oil/gas delivery rate, for a minimum period of twenty minutes is insured. Under no circumstances must the boiler pressure relief valve(s) be tampered with to accomplish this.

(2)Two 3/8 inch diameter holes are provided in the breeching, approximately 4 inches apart and placed so that the one closest to the boiler is approximately one breeching diameter downstream from the boiler outlet. Since these holes must be used for the measurement of boiler outlet gas temperature, percentage of O 2 and smoke reading, it is important that they be placed in the system such that air infiltration from a barometric damper, smoke alarm port, etc., does not affect the composition of the combustion gases.

(c)Performance test equipment. All test data obtained during the performance test must be recorded on a form provided by the department.

(d)Procedure for performance tests. The following is an outline of the procedure which must be used to obtain data necessary for evaluating the performance of an installation and determining whether it meets the requirements specified in subdivision (a), above.

(ii)The percent oxygen (O 2 ) in the flue gas must be determined.

(iii)The pressure differential across the damper of a power operated draft regulator must be determined. This is not applicable to condensing boilers. (A) The pressure differential measurements and the gas temperature and outside ambient air temperature measurements must be used to determine whether adequate pressure differential (e.g., draft) can be provided when outside ambient air temperature is 94F. (B) When a power operated draft regulator is used, the pressure differential measured across the damper must be equal to or greater than the value obtained when the height of the stack (H) is multiplied by ΔDr/H, i.e. ΔP ≥ H × (ΔDr/H) where, ΔP (inches H 2 O) is the pressure differential measured across the power operated draft regulator damper. ΔDr/H (inches H 2 O/ft) is the differential draft per foot obtained from Table I using the outside ambient temperature measured when the performance test was conducted. H (feet) is the height of the stack. (C) When a barometric or manual damper is used, the theoretical pressure differential caused by the barometric or manual damper must be equal to or greater than the value obtained when the height of the stack is multiplied by ΔDr/H, i.e. ΔP ≥ H × (ΔDr/H) where ΔP, ΔDr/H, and H are defined in (B). The static pressure is measured at the boiler outlet. The barometric damper or manual damper is gradually opened until the calculated DP is measured. The barometric damper is then returned to its original setting and the manual damper is then returned to its initial position and fixed. The department will review alternative demonstrations of adequate pressure differential if they comply with 2009 ASHRAE Fundamentals Chapter 21, and are stamped by a professional engineer.

(8)For multiple boiler installations, all boilers must be started up and operated simultaneously at 80 to 110 percent of their respective maximum operational oil/gas delivery rates as specified in the application, provided that this is less than the burner's maximum design oil/gas delivery rate, and the boiler outlet gas temperature, boiler room ambient air temperature, percentage of O 2 , smoke reading, and pressure differential must be determined for each boiler. The burner firing rates for all boilers must then be changed to their respective low-fire firing rates, and the boiler outlet gas temperature, boiler room ambient air temperature, percentage of O 2 in the flue gas, and smoke reading, must be determined for each boiler at this firing rate.

(e)Evaluation. The boiler outlet gas temperature, boiler room air temperature, percentage of O 2 in the flue gas, draft measurement, and smoke reading data must be used to determine whether the installation meets the minimum performance requirements for combustion efficiency, adequate reserve draft and smoke reading.

Common Questions

Our team

Meet the people you will work with

TI

Tiffany Irizarry

Legal Coordinator

OATH / DOB
TI

Tiffany Irizarry

Legal Coordinator

OATH / DOB

Free case review

Talk to an attorney before you act on NYC code.

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

reception@nacmiaslaw.com

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters