Brooklyn since 2014All five boroughsSame-day response during business hours

What is NYC FGC § 625.1?

Quick Answer

This section outlines the testing and installation requirements for refrigerators, mandating compliance with ANSI Z21.19/CSA 1.4 standards. It specifies the necessary clearances for ventilation, including a minimum of 2 inches at the back and 12 inches above the unit if manufacturer instructions are unavailable. Applies to building owners installing refrigerators.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

625.1 General.

FGC § 625.1

Refrigerators shall be tested in accordance with ANSI Z21.19/CSA 1.4 and shall be installed in accordance with the manufacturer's instructions. Refrigerators shall be provided with adequate clearances for ventilation at the top and back, and shall be installed in accordance with the manufacturer's instructions. If such instructions are not available, not less than 2 inches (50.8 mm) shall be provided between the back of the refrigerator and the wall and not less than 12 inches (304.8 mm) above the top.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 625.1?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters