Brooklyn since 2014All five boroughsSame-day response during business hours

What is NYC FGC § 101.2.2?

Quick Answer

This section regulates piping systems for natural gas, including high pressure installations at 15 psig or above, which must also adhere to Appendix G requirements. It encompasses design, materials, components, fabrication, assembly, installation, testing, inspection, operation, and maintenance of these systems. Applies to property operators managing natural gas installations.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

101.2.2 Piping systems.

FGC § 101.2.2

These regulations cover piping systems for natural gas. High pressure natural gas installations at pressures of 15 psig (103.4 kPa gauge) or above shall also comply with the requirements of Appendix G of this code. Coverage shall extend to the outlet of the appliance shutoff valves. Piping system requirements shall include design, materials, components, fabrication, assembly, installation, testing, inspection, operation and maintenance.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 101.2.2?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters