Brooklyn since 2014All five boroughsSame-day response during business hours

What is NYC MC § 511.2?

Quick Answer

This section outlines the design requirements for exhaust outlets exceeding 600°F, mandating compliance with specific construction clearance and termination standards as detailed in Table 511.2. The statute is enforced by the Department of Buildings (DOB). Applies to building owners managing high-temperature exhaust systems.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

511.2 Exhaust outlets.

MC § 511.2

Outlets for exhaust that exceed 600°F (315°C) shall be designed as a chimney in accordance with Table 511.2. Table 511.2 Construction Clearance and Termination Requirements for Single-Wall Metal Dust, Stock and Refuse Conveying Systems Serving Temperature Range Minimum ThicknessTerminationClearanceWalls (inch)LiningAbove roof opening (feet)Above any part of building within (feet) Combustible construction (inches) Noncombustible construction 102550Interior inst. Exterior inst. Interior inst. Exterior inst.High-heat appliances(Over 2,000°F) a0.127 (No. 10 MSG) 4 1/2" laid on 4 1/2" bed 20 ——20See Note cLow-heat appliances(1,000°F normal operation)0.127 (No. 10 MSG) None32 ——186Up to 18" diameter, 2" Over 18" diameter, 4" Medium-heat appliances(2,000°F maximum) b0.127 (No. 10 MSG) Up to 18" dia. – 2 1/2" Over 18" – 4 1/2" On 4 1/2" bed 10 — 10 — 36 24 Up to 18" diameter, 2" Over 18" diameter, 4" For SI: 1 inch = 25.4 mm, 1 foot = 304.8 mm, °C = ((°F) - 32)/1.8. a. Lining shall extend from bottom to top of outlet. b. Lining shall extend from 24 inches below connector to 24 feet above. c. Clearance shall be as specified by the design engineer and shall have sufficient clearance from buildings and structures to avoid overheating combustible materials (maximum 160°F).

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 511.2?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters