Brooklyn since 2014All five boroughsSame-day response during business hours

What is NYC MC § 1004.7?

Quick Answer

This section requires that hot water and steam boilers have all operating and safety controls set and tested by the installing contractor. It mandates the provision of a complete control diagram and boiler operating instructions, which must be accessible in the boiler room. Applies to boiler installers and operators.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

1004.7 Operating adjustments and instructions.

MC § 1004.7

Hot water and steam boilers shall have all operating and safety controls set and operationally tested by the installing contractor. A complete control diagram and boiler operating instructions shall be furnished by the installer for each installation. A complete control diagram of a permanent type shall be located in the boiler room and shall be readily accessible.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 1004.7?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters