What is NYC MC § 1305.9.8?

Quick Answer

This section outlines the requirements for making pipe connections to the main header, specifying that connections shall be made from the top of the header. An exception is provided for systems with appliances above the lowest floor that use fuel pumped from the lowest floor. Applies to building owners and operators involved in plumbing installations.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

1305.9.8 Connections to header.

MC § 1305.9.8

Pipe connections to the main header (supply or return) shall be made from the top of the header. Exception: Systems with appliances above the lowest floor where such appliances are designed to operate utilizing fuel pumped as needed from the lowest floor and without utilizing fuel oil stored via header above the lowest floor.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 1305.9.8?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters