Brooklyn since 2014All five boroughsSame-day response during business hours

What is NYC MC § 1305.13?

Quick Answer

This section outlines the requirements for the installation of tanks, specifying that fuel oil stored on roofs is considered inside buildings. It mandates a minimum clearance of 15 inches around tanks and adherence to manufacturer instructions. Applies to building owners installing fuel oil tanks.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

1305.13 Installation of tanks.

MC § 1305.13

Tanks shall be installed in accordance with the provisions of section 1305.13.1 through 1305.13.4. For the purposes of this section, fuel oil stored on roofs shall be deemed inside of buildings. At least 15 inches (381 mm) clearance shall be provided over tanks and on all sides between the tanks and the enclosure, embankment or dike or greater clearance as required by the manufacturer's instructions.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 1305.13?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters