What is NYC MC § 1210.10?

Quick Answer

This section mandates that before backfilling connection header trenches, the assembled loop system undergoes a pressure test with water at 100 psi for 15 minutes, ensuring no leaks are present. Additionally, flow and pressure loss testing must be conducted, comparing actual values to calculated design values. Applies to building owners responsible for loop system installations.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

1210.10 Tests.

MC § 1210.10

Before connection header trenches are backfilled, the assembled loop system shall be pressure tested with water at 100 psi (689.5 kPa) for 15 minutes, in which time there shall not be observed leaks. Flow and pressure loss testing shall be performed and the actual flow rates and pressure drops shall be compared to the calculated design values. If actual flow rate or pressure drop values differ from calculated design values by more than 10 percent, the cause shall be identified and corrective action taken.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 1210.10?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters