Brooklyn since 2014All five boroughsSame-day response during business hours

What is NYC MC § 1206.7?

Quick Answer

This section addresses the control of flow velocity in hydronic piping systems to minimize the risk of water hammer. It mandates the installation of engineered water-hammer arrestors when quick-closing valves are present, with specific installation guidelines provided by the valve manufacturer. Applies to building owners managing hydronic systems.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

1206.7 Water hammer.

MC § 1206.7

The flow velocity of the hydronic piping system shall be controlled to reduce the possibility of water hammer. Where a quick-closing valve creates water hammer, an engineered water-hammer arrestor shall be installed. The arrestor shall be located within a range as specified by the manufacturer of the quick-closing valve.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 1206.7?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters