Brooklyn since 2014All five boroughsSame-day response during business hours

What is NYC FGC § 503.5.5?

Quick Answer

This section outlines the sizing requirements for chimney venting systems serving various appliances, including those with draft hoods and Category I appliances. It specifies methods for determining effective areas based on appliance specifications and approved engineering methods. Applies to building owners managing chimney systems for listed appliances.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

503.5.5 Size of chimneys.

FGC § 503.5.5

The effective area of a chimney venting system serving listed appliances with draft hoods, Category I appliances, and other appliances listed for use with Type B vents shall be determined in accordance with one of the following methods: 1. The provisions of Section 504.

2.For sizing an individual chimney venting system for a single appliance with a draft hood, the effective areas of the vent connector and chimney flue shall be not less than the area of the appliance flue collar or draft hood outlet, nor greater than seven times the draft hood outlet area.

3.For sizing a chimney venting system connected to two appliances with draft hoods, the effective area of the chimney flue shall be not less than the area of the larger draft hood outlet plus 50 percent of the area of the smaller draft hood outlet, nor greater than seven times the smallest draft hood outlet area.

4.Chimney venting systems using mechanical draft shall be sized in accordance with approved engineering methods.

5.Other approved engineering methods.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 503.5.5?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters