Administrative Code (AC)
Title 28: Construction Codes
Sections in Administrative Code title 28.
- Sections
- 1,295Sections
- Page
- 9 / 13Page
Search NY Legal Codes
Try “24 RCNY 8-09”, “penal law 155.25”, or “cooling tower”.
Sections
- AC § 28-315.6.1
Directional signage at inaccessible building entrances.
- AC § 28-315.6.2
Signage at accessible building entrances.
- AC § 28-315.6.3
Signage for portable ramps at inaccessible building entrances where such ramps are permissible.
- AC § 28-315.7
Building security.
- AC § 28-315.7.1
Security grilles on buildings in occupancy groups B or M.
- AC § 28-315.8
Resiliency.
- AC § 28-315.8.1
Emergency source of water for residential occupancies.
- AC § 28-315.8.2
Connections for temporary external generators.
- AC § 28-315.8.2.1
Modification to the flood hazard area.
- AC § 28-315.8.3
Connections for temporary external boilers and chillers.
- AC § 28-315.8.3.1
Modification to the flood hazard area.
- AC § 28-315.9
Single-occupant toilet rooms.
- AC § 28-316.1
Required insulation of certain concealed piping exposed during alteration or repair.
- AC § 28-317.1
General.
- AC § 28-317.2
Definitions.
- AC § 28-317.31 citations
Registration.
- AC § 28-317.3.11 citations
Discontinued use.
- AC § 28-317.4
Inspecting, cleaning, disinfecting and testing.
- AC § 28-317.52 citations
Annual certification.
- AC § 28-317.6
Fees.
- AC § 28-317.7
Enforcement.
- AC § 28-318.1
General.
- AC § 28-318.2
Frequency of inspection.
- AC § 28-318.3
Inspection process.
- AC § 28-318.3.1
Inspection entity.
- AC § 28-318.3.2
Scope.
- AC § 28-318.3.3
Report and certificate of inspection.
- AC § 28-318.3.4
Reporting and correction of unsafe or hazardous condition.
- AC § 28-318.3.5
Buildings without active gas service.
- AC § 28-318.3.6
Resumption of gas service.
- AC § 28-318.3.7
Extension of time to complete inspection.
- AC § 28-318.4
Fees.
- AC § 28-318.5
Enforcement.
- AC § 28-319.1
Maintenance.
- AC § 28-319.2
Removal.
- AC § 28-320.1
Definitions.
- AC § 28-320.10
Fee schedule.
- AC § 28-320.11
Carbon trading study.
- AC § 28-320.2
Advisory board.
- AC § 28-320.2.1
Advisory board composition.
- AC § 28-320.3
Building emissions limits.
- AC § 28-320.3.1
Annual building emissions limits 2024 through 2029.
- AC § 28-320.3.1.1
Greenhouse gas coefficient of energy consumption for calendar years 2024 through 2029.
- AC § 28-320.3.10
Changes in building status.
- AC § 28-320.3.10.1
Additional time for certain covered buildings.
- AC § 28-320.3.2
Building emissions limits for calendar years 2030 through 2034.
- AC § 28-320.3.2.1
Greenhouse gas coefficients of energy consumption for calendar years 2030 through 2034.
- AC § 28-320.3.3
[Reserved.]*
- AC § 28-320.3.4
Building emissions limits for calendar years 2035 through 2050.
- AC § 28-320.3.5
Building emissions limits on and after calendar year 2050.
- AC § 28-320.3.6
Deductions from reported annual building emissions.
- AC § 28-320.3.6.1
Deductions from reported annual building emissions for renewable energy credits.
- AC § 28-320.3.6.2
Deductions from reported annual building emissions for purchased greenhouse gas offsets.
- AC § 28-320.3.6.3
Deductions from reported annual building emissions for clean distributed energy resources.
- AC § 28-320.3.7
Reports required to be filed by owner.
- AC § 28-320.3.7.1
Extension of time to file report.
- AC § 28-320.3.7.2
Reporting on compliance by the department.
- AC § 28-320.3.8
Continuing requirements.
- AC § 28-320.3.9
Extension for certain income-restricted housing.
- AC § 28-320.4
Assistance.
- AC § 28-320.5
Outreach and education.
- AC § 28-320.5.1
Reporting on outreach and education.
- AC § 28-320.6
Penalties.
- AC § 28-320.6.1
Determination of penalty.
- AC § 28-320.6.1.1
Limitation on the use of renewable energy credits.
- AC § 28-320.6.2
Civil penalty for failure to file report.
- AC § 28-320.6.3
False statement.
- AC § 28-320.6.4
Penalty recovery.
- AC § 28-320.7
Adjustment to applicable annual building emissions limit.
- AC § 28-320.7.1
Effective period.
- AC § 28-320.7.2
Application.
- AC § 28-320.8
Adjustment to applicable annual building emissions limit for calendar years 2024 through 2029.
- AC § 28-320.8.1
Effective period.
- AC § 28-320.8.1.1
Extension of effective period.
- AC § 28-320.8.2
Application.
- AC § 28-320.9
Adjustment to applicable annual building emissions limit for not-for-profit hospitals and healthcare facilities.
- AC § 28-321.1
Definitions.
- AC § 28-321.2
Required energy conservation measures for certain buildings.
- AC § 28-321.2.1
Energy compliant buildings.
- AC § 28-321.2.2
Prescriptive energy conservation measures.
- AC § 28-321.3
Reports.
- AC § 28-321.3.1
Energy compliant buildings reports.
- AC § 28-321.3.2
Prescriptive energy conservation measures reports.
- AC § 28-322.1
Maintenance.
- AC § 28-322.2
Removal.
- AC § 28-322.3
Locking before hurricane or strong wind conditions.
- AC § 28-322.4
Lighting.
- AC § 28-323.12 citations
General.
- AC § 28-323.2
Definitions.
- AC § 28-323.3
Condition assessment.
- AC § 28-323.3.1
Initial condition assessment.
- AC § 28-323.3.2
Subsequent condition assessments.
- AC § 28-323.4
Annual parking structure observation.
- AC § 28-323.51 citations
Report of condition assessment.
- AC § 28-323.5.1
Contents.
- AC § 28-323.5.2
Submission deadlines.
- AC § 28-323.6
Fees.
- AC § 28-323.71 citations
Immediate notice of unsafe condition.
- AC § 28-323.82 citations
Repair of parking structure, unsafe condition.
- AC § 28-323.9
Safe with repair and/or engineering monitoring.
Facing a violation tied to one of these codes?
Nacmias Law Firm represents owners and operators in OATH/ECB matters across all five boroughs, working directly with the codes indexed here.