§ 28-116.2.4.1 — Final inspection prior to certificate of occupancy.

Brooklyn since 2014All five boroughsSame-day response during business hours

What is NYC AC § 28-116.2.4.1?

Quick Answer

This section mandates that a final inspection be conducted by the Department of Buildings before the issuance of a new or amended certificate of occupancy. The inspection involves the permit holder and must confirm compliance with approved construction documents. Applies to building owners seeking a certificate of occupancy for completed work.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

§ 28-116.2.4.1 Final inspection prior to certificate of occupancy.

AC § 28-116.2.4.1

In all cases where the permitted work requires the issuance of a new or amended certificate of occupancy, the final inspection shall be performed by the department in the presence of the permit holder, the registered design professional of record or the superintendent of construction. Such inspection shall be performed after all work authorized by the building permit is completed and before the issuance of the certificate of occupancy. All failures to comply with the provisions of this code or approved construction documents shall be noted and the owner promptly notified thereof in writing. All defects noted in such inspection shall be corrected. Reports of such final inspections shall be maintained by the department. The final inspection report shall confirm that defects noted have been corrected, that the work is in substantial compliance with the approved construction documents and with this code and with other applicable laws and rules and that all required inspections were performed. Exception: For amended certificates of occupancy subject to section 28-118.16.2, the term construction documents, as used in section 28-116.2.4.1, shall consist of an accurate and complete final lot survey made by a land surveyor, and floor and roof plans showing at a minimum compliance with exit requirements in accordance with this code.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 28-116.2.4.1?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters