What is NYC AC § 27-967?

Quick Answer

This section outlines the requirements for inspections and tests of sprinkler systems, including hydrostatic pressure tests, performance tests, and supervisory service checks. It specifies procedures for automatic and nonautomatic systems, as well as requirements for altered systems. Applies to building owners responsible for maintaining sprinkler systems.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

§ 27-967 Inspection and tests.

AC § 27-967

All inspections and tests of sprinkler systems shall be conducted in accordance with the provisions of subdivisions a through f of section 27-951 of article three of this subchapter and the requirements of this article.

(a)Automatic wet and dry systems. Automatic wet and dry sprinkler systems shall be subjected to a hydrostatic pressure test for a period of one hour at a pressure of at least one hundred psig at the topmost sprinkler head and at least two hundred psig at the lowest cross connection to the siamese connections.

(b)Automatic dry pipe systems. In addition to the hydrostatic test in subdivision (a) of this section, the automatic dry pipe systems shall also be tested to forty psig air pressure for a twenty-four hour period with the pressure loss not to exceed one and one-half psig.

(c)Nonautomatic sprinkler systems. Nonautomatic sprinkler systems shall be subjected to a hydrostatic pressure test of fifty psig at the topmost sprinkler head, with the test pressure maintained for a period of at least one hour.

(d)Pressure tanks. Pressure tanks shall be hydrostatically tested to a pressure of at least one and one-half times the working pressure for a period of one hour.

(e)Sprinkler branches and heads supplied from domestic water. Sprinkler branches and heads shall be tested at the pressure required by this section or at the pressure of the domestic water supply as required by subchapter sixteen of this chapter, whichever is greater.

(f)System performance. A performance or operation test shall be made on each completed system to determine that all alarms, valves, indicators, pumps, deluge valves, dry pipe valves, and other appurtenances are in good working order.

(g)Supervisory service. All components connected to a central station of an approved operating fire alarm company shall be tested to determine that they are in good working order. The test report shall be accompanied by a statement from the central supervisory agency stating that the agency has been retained to provide the required supervision; and when the services of the agency have been terminated it shall notify the commissioner in writing.

(h)Altered systems. When additions, alterations, or repairs are made to a sprinkler system, the entire system shall be tested as stated in subdivisions (a), (b), (c), (e), and (g) of this section, except that the pressure at the top of the system need not exceed one hundred psig. In addition, a flow test of at least twenty gpm shall be made from a test connection at the end of the sprinkler header or the section altered or repaired.

(i)Pump tests. Pumps shall be tested in accordance with the applicable provisions of subdivisions (h) and (i) of section 27-951 of article three of this subchapter.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 27-967?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]