NYC Administrative Code

§ 27-698 — Where more than one pile type, pile capacity, or method of pile installation is used.

Brooklyn since 2014All five boroughsSame-day response during business hours

What is NYC AC § 27-698?

Quick Answer

This section outlines requirements for constructing or modifying foundations using multiple pile types, capacities, or installation methods. It mandates the separation of building parts supported by different piles to accommodate differential movement, or the submission of a report by an architect or engineer to ensure safety and stability. Applies to building owners involved in foundation construction or modification.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

§ 27-698 Where more than one pile type, pile capacity, or method of pile installation is used.

AC § 27-698

Wherever it is proposed to: (1) construct a foundation for a building utilizing piles of more than one type or capacity; (2) modify an existing foundation by the addition of piles of a type or capacity other than those of the existing piling; (3) construct or modify a foundation utilizing different methods or more than one method of installation, or using different types or capacities of equipment (such as different types of hammers having markedly different striking energies or speeds); or (4) support part of a building on piles and part on footings, the several parts of the building supported on the different types, capacities, or modes of piling shall be separated by suitable joints providing for differential movement, or a report shall be submitted by the architect or engineer establishing to the satisfaction of the commissioner that the proposed construction is adequate and safe, and showing that the probable settlements and differential settlements to be expected will not result in instability of the building or stresses in the structure in excess of the allowable values established in subchapter ten of this chapter. The provisions of subdivision (d) of section 27-700 of article eight of this subchapter relating to required load tests shall apply separately and distinctly to each different type or capacity of piling, method of installation, or type or capacity of equipment used, except where analysis of the probable, comparative behavior of the different types or capacities of the piles or the methods of installation indicates that data on one type or capacity of pile permits a reliable extrapolation of the probable behavior of the piles of other types and capacities.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 27-698?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters