What is NYC ZR § 93-561?

Quick Answer

This section outlines regulations for buildings within Sites 1 through 6 in Subdistrict F, including street wall locations, height and setback measurements, and criteria for tower placements. The Department of Buildings enforces these regulations. Applies to building owners operating in Subdistrict F.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

§ 93-561 General rules for Subdistrict F

ZR § 93-561

The following regulations shall apply to all buildings within Sites 1 through 6:

(a)Street wall locationFor the purposes of applying the height and setback regulations of this Section, inclusive, wherever a building fronts upon any publicly accessible open space, private street or pedestrian way, as shown on Map 3 (Subdistrict F: Public Access Area Plan) in Appendix B, the boundary of such publicly accessible open spaces, private streets or pedestrian ways shall be considered to be a street line. Furthermore, for the purposes of applying such height and setback regulations, the sidewalk widening line required along Eleventh Avenue shall be considered the Eleventh Avenue street line.Wherever a building on Sites 1, 5 or 6 faces the High Line, the street wall shall not be located closer than five feet to the edge of the High Line, as shown on Map 3. Such five foot separation shall remain unobstructed, from the level of finished grade adjacent to a building, to the sky, except as permitted:

(1)for that portion of a building on Site 5 located above a height of 50 feet as measured from the High Line bed, pursuant to Section 93-567 (Site 5);

(2)for that portion of a building on Site 6 located below the High Line, pursuant to Section 93-568 (Site 6); and

(3)pursuant to paragraph (d) of Section 93-756 (General requirements for the High Line).

(b)Measurement of building heights

(i)on Site 6, the portion of a street wall above the High Line bed facing the High Line beyond 60 feet of Eleventh Avenue; and

(ii)on Site 6, along the Southwest Open Space within 60 feet of the High Line.

(c)TowersCriteria for towers on Sites 1 through 6 are set forth in this Section, inclusive. The minimum distance between all such towers shall be 60 feet.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 93-561?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters