Brooklyn since 2014All five boroughsSame-day response during business hours

What is NYC PC § 903.5.1?

Quick Answer

This section regulates the placement of open vent terminals from drainage systems in new or altered buildings. It prohibits vent terminals from being located directly beneath doors, operable windows, or air intakes of adjacent buildings and sets specific distance and height requirements. Applies to building owners involved in construction or alteration projects.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

903.5.1 New vent terminals.

PC § 903.5.1

An open vent terminal from a drainage system of the new or altered building shall not be located directly beneath any door, operable window, or other air intake opening of the building or of an adjacent building, and any such vent terminal shall not be within 10 feet (3048 mm) horizontally of such an opening unless it is at least 3 feet (914 mm) above the top of such opening. When the consent of the owner of an adjoining taller building is obtained, the owner of the new or altered building shall be permitted to carry the new vent stack, with adequate support, to a level above the higher existing roof.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 903.5.1?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters