What is NYC PC § 708.1.5?

Quick Answer

This section outlines the size requirements for cleanouts in plumbing systems, specifying that cleanouts should match the size of the piping they serve, with certain exceptions for larger pipes and specific configurations. Applies to building owners managing plumbing installations.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

708.1.5 Cleanout size.

PC § 708.1.5

Cleanouts shall be the same size as the piping served by the cleanout, except that cleanouts for piping larger than 4 inches (102 mm) need not be larger than 4 inches (102 mm). Exceptions: 1. A removable P-trap with slip or ground joint connections can serve as a cleanout for drain piping that is one size larger than the P-trap size.

2.Cleanouts located on stacks can be one size smaller than the stack size.

3.The size of cleanouts for cast-iron piping can be in accordance with the referenced standards for cast-iron fittings as indicated in Table 702.4.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 708.1.5?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters