Brooklyn since 2014All five boroughsSame-day response during business hours

What is NYC PC § 708.1.4?

Quick Answer

This section mandates the installation of cleanouts at changes of direction in horizontal drainage pipes, building drains, or building sewers exceeding 45 degrees. If multiple such changes occur within 40 feet, the first cleanout serves all subsequent changes within that distance. Applies to building owners responsible for drainage systems.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

708.1.4 Changes of direction.

PC § 708.1.4

Where a horizontal drainage pipe, a building drain or a building sewer has a change of horizontal direction greater than 45 degrees (0.79 rad), a cleanout shall be installed at the change of direction. Where more than one change of horizontal direction greater than 45 degrees (0.79 rad) occurs within 40 feet (12 192 mm) of developed length of piping, the cleanout installed for the first change of direction shall serve as the cleanout for all changes in direction within that 40 feet (12 192 mm) of developed length of piping.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 708.1.4?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters