What is NYC PC § 708.1.1?

Quick Answer

This section mandates the installation of cleanouts for horizontal drainage pipes and building drains at intervals not exceeding 100 feet. An exception is provided for horizontal fixture drain piping serving a nonremovable trap, which does not require a cleanout between the trap and the vent connection. Applies to building owners managing drainage systems.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

708.1.1 Horizontal drains and building drains.

PC § 708.1.1

Horizontal drainage pipes in buildings shall have cleanouts located at intervals of not more than 100 feet (30 480 mm). Building drains shall have cleanouts located at intervals of not more than 100 feet (30 480 mm). Exception: Horizontal fixture drain piping serving a nonremovable trap shall not be required to have a cleanout for the section of piping between the trap and the vent connection for such trap.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 708.1.1?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters