What is NYC PC § 608.13.1?

Quick Answer

This section establishes the minimum required air gap measurement for potable water outlets, specifying that it is to be measured vertically from the outlet to the flood level rim of the receiving fixture. Compliance with ASME standards is required. Applies to building owners installing potable water systems.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

608.13.1 Air gap.

PC § 608.13.1

The minimum required air gap shall be measured vertically from the lowest end of a potable water outlet to the flood level rim of the fixture or receptacle into which such potable water outlet discharges. Air gaps shall comply with ASME A112.1.2 and air gap fittings shall comply with ASME A112.1.3.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 608.13.1?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters