Brooklyn since 2014All five boroughsSame-day response during business hours

What is NYC FC § 6404.2.1?

Quick Answer

This section outlines the required distances for the storage of pyrophoric solids, liquids, and gases from buildings, lot lines, and public streets. It specifies distances based on the type of material and includes a table detailing maximum amounts and minimum distances. Applies to property operators managing hazardous materials.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

6404.2.1 Distance from storage to exposures.

FC § 6404.2.1

The separation of pyrophoric solids, liquids and gases from buildings, lot lines, public streets, private roads or means of egress shall be in accordance with the following: 1. Solids and liquids. Two times the separation required by FC Chapter 57 for Class IB flammable liquids.

2.Gases. The location and maximum amount of pyrophoric gas per storage area shall be in accordance with FC Table 6404.2.1. FC Table 6404.2.1Pyrophoric Gases – Distance from Storage to Exposures a Maximum Amount per Storage Area(cubic feet)Minimum Distance Between Storage Areas(feet)Minimum Distance to Lot Lines(feet)Minimum Distance to Public Streets and Private Roads(feet)Minimum Distance to Buildings on the Same PropertyNonrated construction or openings within 25 feetTwo-hour construction and no openings within 25 feetFour-hour construction and no openings within 25 feet25052555002,50010501010507,500201002020100 For SI: 1 foot = 304.8 mm, 1 cubic foot = 0.02832 m3. a. The minimum required distances shall be reduced to 5 feet when protective structures having a minimum fire resistance of 2 hours interrupt the line of sight between the container and the exposure. The protective structure shall be at least 5 feet from the exposure. The configuration of the protective structure shall allow natural ventilation to prevent the accumulation of hazardous gas concentrations.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 6404.2.1?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters