Brooklyn since 2014All five boroughsSame-day response during business hours

What is NYC FC § 608.9.4.2?

Quick Answer

This section mandates that outdoor systems, including reach-in and walk-in facilities and mobile systems, must be designed and installed according to specified rules. It restricts the installation of rooftop systems with an aggregate rated energy capacity exceeding 400 kWh to buildings of noncombustible construction. Applies to building owners installing outdoor energy systems.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

608.9.4.2 Outdoor systems.

FC § 608.9.4.2

Outdoor systems, including reach-in and walk-in facilities and mobile systems, shall be designed and installed in accordance with the rules. Rooftop systems with an aggregate rated energy capacity exceeding 400 kWh, other than lead acid battery systems, may be installed only on the rooftops of buildings of noncombustible construction.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 608.9.4.2?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters