Brooklyn since 2014All five boroughsSame-day response during business hours

What is NYC FC § 608.9.4.1.4?

Quick Answer

This section outlines the requirements for the installation of indoor systems within designated control areas. It specifies that these areas must be designed, installed, operated, and maintained according to established guidelines, including capacity limits and occupancy classifications. Applies to building owners managing indoor energy storage systems.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

608.9.4.1.4 Control areas.

FC § 608.9.4.1.4

Indoor systems shall be installed only in control areas designed, installed, operated and maintained in accordance with this section. The maximum aggregate rated energy capacity of indoor systems per control area shall be in accordance with FC 608.9.1. The design and number of control areas per floor shall be in accordance with FC 5003.8.3.3, including FC Table 5003.8.3.3, except that (subject to FC 608.9.4.1.9 and FC 608.9.4.1.10) each control area housing an indoor stationary energy storage system shall be designed and constructed as a high-hazard occupancy, and rooftop installations shall be treated as outdoor installations.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 608.9.4.1.4?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters