What is NYC BC § 909.20.5?

Quick Answer

This section outlines the requirements for stairway and ramp pressurization in buildings equipped with an automatic sprinkler system. It specifies the acceptable pressure range for interior exit stairways or ramps, measured under specific conditions. Applies to building owners of structures with automatic sprinkler systems.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

909.20.5 Stairway and ramp pressurization alternative.

BC § 909.20.5

Where the building is equipped throughout with an automatic sprinkler system in accordance with Section 903.3.1.1, the vestibule is not required, provided each interior exit stairway or ramp is pressurized to not less than 0.10 inch of water (24.9 Pa) and not more than 0.35 inches of water (87.2 Pa) in the shaft relative to the building measured with all interior exit stairway and ramp doors closed under maximum anticipated conditions of stack effect and wind effect.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 909.20.5?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters