What is NYC BC § 909.13?

Quick Answer

This section outlines the requirements for control air tubing, specifying that it must be of adequate size to ensure required response times. The statute mandates that tubing be cleaned and dried before final connections, supported properly, and protected from damage, particularly when passing through concrete or masonry. Applies to building owners responsible for installation and maintenance of control air systems.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

909.13 Control air tubing.

BC § 909.13

Control air tubing shall be of sufficient size to meet the required response times. Tubing shall be flushed clean and dry prior to final connections and shall be adequately supported and protected from damage. Tubing passing through concrete or masonry shall be sleeved and protected from abrasion and electrolytic action.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 909.13?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters