Brooklyn since 2014All five boroughsSame-day response during business hours

What is NYC PC § 504.7.2?

Quick Answer

This section outlines the requirements for the termination of pan drains, specifying that they must extend to either a suitable indirect waste receptor or to the exterior of the building. The termination height must be between 6 and 24 inches above the ground and readily observable by building occupants. Applies to building owners responsible for drainage systems.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

504.7.2 Pan drain termination.

PC § 504.7.2

The pan drain shall extend full size and terminate over a suitably located indirect waste receptor or floor drain or extend to the exterior of the building and terminate not less than 6 inches (152 mm) and not more than 24 inches (610 mm) above the adjacent ground surface at a point that is readily observable by the building occupants.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 504.7.2?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters