What is NYC PC § 312.7?

Quick Answer

This section outlines the procedure for conducting forced drain tests, which involves plugging the pump discharge and applying specific pressure conditions for a defined duration. The statute is relevant to those involved in the maintenance and operation of building drainage systems.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

312.7 Forced drain test.

PC § 312.7

Forced drain tests shall consist of plugging the end of the pump discharge at the point of connection with the building drain and applying a pressure of 5 psi (34.5 kPa) greater than the shut off pump rating, and maintaining such pressure for 15 minutes.

Common Questions

Our team

Meet the people you will work with

Free case review

Talk to an attorney before you act on NYC code.

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters