What is NYC PC § 312.4?

Quick Answer

This section outlines the requirements for the final inspection of drainage and vent systems, specifying that the inspection must be visual and detailed enough to ensure compliance with the code. It also describes the procedure for conducting a smoke test to verify system integrity. Applies to building owners responsible for drainage and vent systems.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

312.4 Drainage and vent final inspection.

PC § 312.4

The final inspection of the completed drainage and vent systems shall be visual and in sufficient detail to determine compliance with the provisions of this code. Where a smoke test is utilized, it shall be made by filling all traps with water and then introducing into the entire system a pungent, thick smoke produced by one or more smoke machines. When the smoke appears at stack openings on the roof, the stack openings shall be closed and a pressure equivalent to a 1-inch water column (248.8 Pa) shall be held for a test period of not less than 15 minutes.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 312.4?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters