What is NYC PC § 306.2.2?

Quick Answer

This section outlines the requirements for rock removal during trenching operations. It specifies that rock must be removed to a depth of at least 3 inches below the pipe installation level, and the trench must be backfilled with sand to ensure proper support for the pipe. Applies to contractors and property operators involved in trenching activities.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

306.2.2 Rock removal.

PC § 306.2.2

Where rock is encountered in trenching, the rock shall be removed to not less than 3 inches (76 mm) below the installation level of the bottom of the pipe, and the trench shall be backfilled to the installation level of the bottom of the pipe with sand tamped in place so as to provide uniform load- bearing support for the pipe between joints. The pipe, including the joints, shall not rest on rock at any point.

Common Questions

Our team

Meet the people you will work with

Free case review

Talk to an attorney before you act on NYC code.

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters