Brooklyn since 2014All five boroughsSame-day response during business hours

What is NYC PC § 305.4.1?

Quick Answer

This section establishes the minimum depth requirements for building drains and sewers that connect to private sewage disposal systems. Specifically, it mandates that these systems must be installed at least 36 inches below finished grade at the septic tank connection point. Applies to building owners with private sewage systems.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

305.4.1 Building sewer and building drain depth.

PC § 305.4.1

Building drains that connect to private sewage disposal systems shall be a minimum of 36 inches (914 mm) below finished grade at the point of septic tank connection. Building sewers and drains shall be a minimum of 36 inches (914 mm) below grade.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 305.4.1?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters