Brooklyn since 2014All five boroughsSame-day response during business hours

What is NYC PC § 1403.1.5?

Quick Answer

This section outlines the requirements for the installation of aggregate and backfill around distribution piping. It specifies the depth and size of the aggregate, the materials for covering, and the necessary soil backfill. Applies to building owners involved in construction or renovation projects requiring compliance with these specifications.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

1403.1.5 Aggregate and backfill.

PC § 1403.1.5

Not less than 6 inches in depth of aggregate, ranging in size from 1/2 to 2 1/2 inches (12.7 mm to 64 mm), shall be laid into the trench below the distribution piping elevation. The aggregate shall be evenly distributed not less than 2 inches (51 mm) in depth over the top of the distribution pipe. The aggregate shall be covered with approved synthetic materials or 9 inches (229 mm) of uncompacted marsh hay or straw. Building paper shall not be used to cover the aggregate. Not less than 9 inches (229 mm) of soil backfill shall be provided above the covering.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 1403.1.5?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters