Brooklyn since 2014All five boroughsSame-day response during business hours

What is NYC PC § 1403.1.3?

Quick Answer

This section outlines the requirements for seepage bed excavations, specifying dimensions for width and distribution pipe spacing. It details the calculation of the absorption area based on the trench bottom and the necessary distances between pipes and walls. Applies to building owners involved in excavation work related to seepage beds.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

1403.1.3 Seepage bed excavations.

PC § 1403.1.3

Seepage bed excavations shall be not less than 5 feet (1524 mm) in width and have more than one distribution pipe. The absorption area of a seepage bed shall be computed by using the bottom of the trench area. Distribution piping in a seepage bed shall be uniformly spaced not greater than 5 feet (1524 mm) and not less than 3 feet (914 mm) apart, and greater than 3 feet (914 mm) and not less than 1 foot (305 mm) from the sidewall or headwall.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 1403.1.3?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters