What is NYC PC § 1301.9.11?

Quick Answer

This section outlines the testing procedures for storage tanks, requiring them to be filled with water to the overflow line during inspection. It specifies the need for leak checks, proper drainage verification, and operational observations of the tank drain and makeup water system. Applies to property operators managing storage tanks.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

1301.9.11 Storage tank tests.

PC § 1301.9.11

Storage tanks shall be tested in accordance with the following: Storage tanks shall be filled with water to the overflow line prior to and during inspection. All seams and joints shall be left exposed and the tank shall remain water tight without leakage for a period of 24 hours.

1.After 24 hours, supplemental water shall be introduced for a period of 15 minutes to verify proper drainage of the overflow system and that there are no leaks.

2.The tank drain shall be observed for proper operation.

3.The makeup water system shall be observed for proper operation and successful automatic shutoff of the system at the refill threshold shall be verified.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 1301.9.11?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters