Brooklyn since 2014All five boroughsSame-day response during business hours

What is NYC PC § 1114.4.1?

Quick Answer

This section mandates that all drywells include a grit chamber as part of their system, detailing specific construction requirements such as access cover size, load support, and dimensional standards for the chamber. Applies to building owners responsible for drywell installations.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

1114.4.1 Grit chamber.

PC § 1114.4.1

All drywells shall contain a grit chamber as part of the drywell system. Grit chambers shall be constructed in accordance with the following requirements: 1. Solid access cover with a minimum diameter of 15 inches (381 mm).

2.Grit chamber designed to support the maximum anticipated load.

3.Outlet invert elevation shall be a minimum of 1 inch (25 mm) lower than the lowest inlet elevation.

4.The sump shall be a minimum of 18 inches (450 mm) or two times the largest inlet pipe diameter, whichever is greater, as measured to the outlet invert elevation.

5.The interior dimensions shall be a minimum of 18 inches (450 mm) or four times the largest inlet pipe diameter whichever is greater.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 1114.4.1?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters