What is NYC PC § 1114.1.3?

Quick Answer

This section establishes minimum setback requirements for on-site stormwater disposal systems, mandating their placement at least 5 feet from lot lines and 10 feet from existing foundations. Additionally, systems must be 20 feet from disposal fields and seepage pits, and cannot be within the building footprint. Applies to property operators managing stormwater systems.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

1114.1.3 Minimum setbacks.

PC § 1114.1.3

On-site stormwater disposal systems shall be located at least 5 feet (1524 mm) from all lot lines except where the lot line abuts a public right of way and 10 feet (3048 mm) from all foundations or walls existing on the date of application for a building permit or proposed under the application to construct the on-site stormwater disposal system. Systems shall be located 20 feet (6096 mm) from disposal fields and 20 feet (6096 mm) from seepage pits. On-site stormwater disposal systems shall not be located within the building footprint.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 1114.1.3?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters