Brooklyn since 2014All five boroughsSame-day response during business hours

What is NYC PC § 1113.1.4?

Quick Answer

This section outlines the requirements for discharge piping, mandating the inclusion of a gate valve and a full flow check valve. It specifies that the pipe and fittings must match or exceed the size of the pump discharge tapping, with exceptions for one- and two-family dwellings. Applies to building owners responsible for plumbing installations.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

1113.1.4 Piping.

PC § 1113.1.4

Discharge piping shall meet the requirements of Section 1102.2, 1102.3 or 1102.4 and shall include a gate valve and a full flow check valve. Pipe and fittings shall be the same size as, or larger than, the pump discharge tapping. Exception: In one- and two-family dwellings, only a check valve shall be required, located on the discharge piping from the pump or ejector.

Common Questions

Our team

Meet the people you will work with

TI

Tiffany Irizarry

Legal Coordinator

OATH / DOB
TI

Tiffany Irizarry

Legal Coordinator

OATH / DOB

Free case review

Have a matter that touches § 1113.1.4?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

reception@nacmiaslaw.com

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters