What is NYC PC § 1108.3?

Quick Answer

This section outlines the requirements for sizing secondary (emergency) roof drain systems based on a specified rainfall rate. It specifies that scuppers must prevent excessive ponding and have a minimum opening dimension. Applies to building owners responsible for roof drainage systems.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

1108.3 Sizing of secondary drains.

PC § 1108.3

Secondary (emergency) roof drain systems shall be sized in accordance with Section 1106 based on the rainfall rate of 3 inches (76 mm) per hour. Scuppers shall be sized to prevent the depth of ponding water from exceeding that for which the roof was designed as determined by Section 1101.7. Scuppers shall have an opening dimension of not less than 4 inches (102 mm). The flow through the primary system shall not be considered when sizing the secondary roof drain system. Exception: Where secondary drainage systems tie into primary drainage systems, the combined primary and secondary system shall be sized based on their combined rainfall rate of 6 inches (152 mm) per hour.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 1108.3?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters