What is NYC PC § 1003.4.2.1?

Quick Answer

This section outlines the general design requirements for oil separators, specifying a minimum depth of 2 feet below the discharge drain invert and an outlet opening with at least an 18-inch water seal. Applies to building owners installing oil separators.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

1003.4.2.1 General design requirements.

PC § 1003.4.2.1

Oil separators shall have a depth of not less than 2 feet (610 mm) below the invert of the discharge drain. The outlet opening of the separator shall have not less than an 18-inch (457 mm) water seal.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 1003.4.2.1?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters