What is NYC FC § 5706.4.17?

Quick Answer

This section outlines the testing requirements for tanks and piping during installation, specifying that aboveground, underground, and mounded-over tanks must be filled with water for at least 24 hours. Additionally, piping must undergo hydrostatic testing at specified pressure levels. Applies to building owners responsible for tank and piping installations.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

5706.4.17 Tank and piping test.

FC § 5706.4.17

Tank and piping shall be tested at the time of installation at the owner's risk by his or her representative before a representative of the department as follows: 1. Aboveground, underground and mounded-over tanks shall be filled to capacity with water and maintained for not less than 24 hours.

2.Piping shall be hydrostatically tested to a pressure of 100 pounds per square inch (psig) (689.5 kPa) or 150 percent of the maximum operating pressure, whichever is greater, for 30 minutes.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 5706.4.17?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters