5706.4.17 Tank and piping test.
FC § 5706.4.17
Tank and piping shall be tested at the time of installation at the owner's risk by his or her representative before a representative of the department as follows: 1. Aboveground, underground and mounded-over tanks shall be filled to capacity with water and maintained for not less than 24 hours.
2.Piping shall be hydrostatically tested to a pressure of 100 pounds per square inch (psig) (689.5 kPa) or 150 percent of the maximum operating pressure, whichever is greater, for 30 minutes.