5704.2.9.6.3 Secondary containment.
FC § 5704.2.9.6.3
Protected aboveground tanks shall be provided with secondary containment, drainage control or diking in accordance with FC 5004.2 and 6 NYCRR Part 613. A means shall be provided to establish the integrity of the secondary containment in accordance with NFPA 30.













