What is NYC FC § 5704.2.13.2.3?

Quick Answer

This section outlines the requirements for the removal or sealing of aboveground tanks that have been out of service for one year or more. It specifies procedures for the removal of flammable liquids, rendering tanks vapor-free, and securing system piping. Applies to building owners with aboveground tanks that are no longer in use.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

5704.2.13.2.3 Out of service for 1 year.

FC § 5704.2.13.2.3

Except as otherwise provided in FC 5704.2.13.2.1, aboveground tanks that have been out of service for a period of 1 year or more shall be removed from the premises or sealed in place in compliance with the following requirements: 1. Flammable and combustible liquids shall be removed from the tank and connected piping.

2.The tank and connecting piping shall be rendered free of flammable and combustible vapors using an inert gas.

3.The tank shall be disconnected from system piping and removed from the premises, or filled completely with an approved, inert solid material, and sealed in place.

4.All system piping, including fire extinguishing system lines, fill line, gauge opening, and vapor return and pump connection, shall be disconnected from the tank and removed from the premises, or sealed in place and secured from tampering. Unless other methods are approved, the fill connection shall be cut from the fill piping and removed; the fill piping shall be capped or plugged; and the spill containment box shall be removed.

5.Tank openings shall be capped and plugged, leaving a 0.125-inch to 0.25-inch-diameter (3.2-mm to 6.4-mm-diameter) opening for pressure equalization, when tanks are removed from the premises.

6.The tank shall be protected from flotation in accordance with good engineering practice.

7.The tank shall be stenciled with the date that it was sealed in place.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 5704.2.13.2.3?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters