5607.22 Post-blasting survey.
FC § 5607.22
The owner and/or its general contractor or blasting contractor shall retain the services of a professional engineer, licensed to practice in New York State, to conduct a post-blasting survey in accordance with 5607.22.1 through 5607.22.2.













