What is NYC FC § 5607.2.3?

Quick Answer

This section requires the preparation and submission of a monitoring plan for blast impacts on buildings and infrastructure. The plan must include details on monitoring devices, notification procedures for exceeding vibration limits, and actions to ensure structural stability. Applies to building owners involved in blasting operations.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

5607.2.3 Monitoring plan and vibration limits.

FC § 5607.2.3

A monitoring plan shall be prepared and submitted for department review and approval setting forth the manner in which blast impacts (ground vibrations and air overpressure) upon buildings, structures, and infrastructure will be monitored. The monitoring plan shall be based upon the blasting plan and the pre-blasting survey, including the findings of the engineer who conducted the survey of structural conditions. The monitoring plan shall include the following information and documentation and such other information and documentation as the department may require: 1. The location and elevation of vertical control points on such buildings, structures and infrastructure, and shall set forth the type and location of any monitoring devices to be used, including tell-tales. The department may require monitoring of water shock when submarine (underwater) blasting is conducted.

2.Notification procedures to be undertaken if and when limits for ground vibration and/or air overpressure are exceeded, including notifications required by FC 5607.19.4.1.

3.Actions to be taken in response to limits for ground vibration and/or air overpressure being exceeded, including building inspection procedures, staffing, and use of the global strain method.

4.Preparation and submission to the Department of Buildings such documentation as that agency may require with respect to the continuing structural stability of affected buildings and any actions that may need to be taken to protect public safety.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 5607.2.3?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters