What is NYC FC § 5607.2.1?

Quick Answer

This section mandates that a professional engineer conduct a structural survey of all buildings and infrastructure within 100 feet of a blasting job site before operations commence. The survey must include contact information for owner representatives of affected properties. Applies to property owners near blasting sites.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

5607.2.1 Pre-blasting survey.

FC § 5607.2.1

Prior to commencement of blasting operations, a professional engineer shall conduct a structural survey of all buildings, structures, and infrastructure, including all landmarks and monuments, within 100 feet (30 480 mm) of the property line of the job site. The pre-blasting survey shall include the names and contact information of owner representatives of all affected buildings, occupancies and infrastructure.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 5607.2.1?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters