5607.19.1 Limits.
FC § 5607.19.1
The limits for ground vibrations and air overpressure and other impacts associated with blasting operations shall be as set forth in FC 5607.19.1.1 through 5607.19.1.4. FC Table 5607.19.1Maximum Allowable Ground Vibrations from Blasting Operations Limit A:Maximum allowable PPV for any building or structure, except those subject to the higher Limit B or in a fragile or vibration-sensitive condition determined to require a lower limit.Limit B:Maximum allowable PPV for all buildings and structures four stories or taller in height, except those with landmark or historical status or in a fragile or vibration-sensitive condition.