What is NYC FC § 5607.19.1?

Quick Answer

This section establishes limits for ground vibrations and air overpressure resulting from blasting operations. It specifies maximum allowable peak particle velocity (PPV) thresholds for buildings and structures, with different limits based on height and sensitivity to vibrations. Applies to property operators involved in blasting activities.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

5607.19.1 Limits.

FC § 5607.19.1

The limits for ground vibrations and air overpressure and other impacts associated with blasting operations shall be as set forth in FC 5607.19.1.1 through 5607.19.1.4. FC Table 5607.19.1Maximum Allowable Ground Vibrations from Blasting Operations Limit A:Maximum allowable PPV for any building or structure, except those subject to the higher Limit B or in a fragile or vibration-sensitive condition determined to require a lower limit.Limit B:Maximum allowable PPV for all buildings and structures four stories or taller in height, except those with landmark or historical status or in a fragile or vibration-sensitive condition.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 5607.19.1?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters