Brooklyn since 2014All five boroughsSame-day response during business hours

What is NYC FC § 5607.12.1.2?

Quick Answer

This section outlines the conditions under which blasting mats or other protective measures are not required during tunnel blasting operations. Specifically, these measures may be waived if the blasting heading is more than 100 feet from the tunnel opening and at least 10 feet below the surrounding rock surface. Applies to contractors and operators involved in tunnel construction.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

5607.12.1.2 Tunnel blasting.

FC § 5607.12.1.2

Blasting mats or other approved protective measures may not be required when the heading to be blasted is situated more than 100 feet (30 480 mm) from the mouth or opening of a tunnel and is at least 10 feet (3048 mm) below the outer surface of the surrounding rock.

Common Questions

Our team

Meet the people you will work with

Free case review

Talk to an attorney before you act on NYC code.

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters