Brooklyn since 2014All five boroughsSame-day response during business hours

What is NYC FC § 512.4.1?

Quick Answer

This section outlines the requirements for the location of photovoltaic solar panel installations on pitched roofs. It specifies that conduit and wiring systems must be positioned to enhance ventilation and minimize the amount of conduit used. Applies to building owners installing solar panels on pitched roofs.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

512.4.1 Location of photovoltaic solar panel installations on pitched roofs.

FC § 512.4.1

Direct current conduit, wiring systems, and raceways for photovoltaic circuits installed on pitched roofs subject to the requirements of FC 512.3 shall be located along hips and valleys, away from the ridge, and on outside walls, to maximize ventilation opportunities. Conduit runs between sub-arrays and to direct current combiner boxes shall be installed in a manner that minimizes the total amount of conduit on the roof by taking the shortest path from the array to the direct current combiner box, except as necessary to minimize the tripping hazard. The direct current combiner boxes shall be located such that conduit runs are minimized in the pathways between arrays.

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 512.4.1?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters