Brooklyn since 2014All five boroughsSame-day response during business hours

What is NYC FC § 504.4.8?

Quick Answer

This section outlines the requirements for vertical clearance above rooftops of buildings constructed over other buildings, ensuring adequate space for firefighting operations. Design documents must be submitted to the Fire Department for review and approval. Applies to building owners with cantilevered structures over other buildings.

General informational summary. Not legal advice for your situation. Consult an attorney before acting on any specific matter.

Michael Nacmias - Founding PartnerMichael Sargo - Partner
From the team atNacmias Law Firm, PLLCBrooklyn-based attorneys representingproperty owners across all five boroughsMeet the team →

504.4.8 Rooftop access underneath cantilevered or overhead buildings.

FC § 504.4.8

Where a building is constructed directly above another building, including a building cantilevered over another building, a vertical clearance from the rooftop of the building below shall be provided for firefighting operations in accordance with the following requirements. Design and installation documents documenting compliance with this section, including the fire analysis filed with the Department of Buildings, shall be submitted for Fire Department review and approval. Such vertical clearance: 1. shall be at least 12 feet (3658 mm); and 2. shall be at least 9 feet (2743 mm) above the highest building feature on the rooftop when the building feature is 25 feet (7620 mm) or less from the closest exterior surface of the building constructed above; but 3. shall not apply to rooftop areas above which a noncombustible screen wall or other similar structure has been constructed for purposes of zoning compliance, provided that such structure extends below the cantilever from the side wall of the new building facing a street for a width not to exceed 8 feet (2438 mm) and a depth not to exceed 12 feet (3658 mm).

Common Questions

Our team

Meet the people you will work with

Free case review

Have a matter that touches § 504.4.8?

Free 15-minute case review with the attorney handling your matter. Same-day response during business hours across all five boroughs — OATH hearings, Housing Court, and real estate closings.

Or email us

[email protected]

An attorney reads every message.

  • Same-day response

    During business hours

  • Direct attorney access

    Same lawyer from intake to close

  • Flat-fee pricing

    On most OATH and closing matters